Hotel Kastro is a small family business located in front of the beautiful beach of Stoupa and consists of 8 double, 3 triple and 1 single, as well as the business restaurant.
The benefits of the restaurant from the upgrade of the gas network:
- The absolute safety of staff and customers even in unlikely cases such as fire or earthquake.
- Full compliance with the technical regulation, thus avoiding fines by the competent authorities.
- Uninterrupted operation and long life of the network due to the high quality of our materials and installers.
- Regular annual maintenance - by EOT-EXE - as required by the regulation.
- Immediate in case of possible damages or undesirable situations due to the 24-hour operation of our special team of engineers and licensed technicians.
For network security the devices that were deemed necessary to be replaced were:
- 1st stage regulator 24Kgr/h 0,7bar, with integrated SAV shut-off valve and SBV GOK Germany pressure relief valve.
- 2d stage regulator 24Kgr/h 37mbar, with integrated SAV shut-off valve and pressure relief valve SBV, GOK Germany.
- German stainless steel spiral 1000mm for connecting kitchen appliances to the gas network.
- Autonomous Industrial Gas Detector type SE 235KG , 230V IP65 Technocontrol Italy for Kitchen and Boiler Room
Finally, the owners of the hotel have all the necessary documents for the LPG installation they have, with the issuance of the certificate of proper operation of the installation and the stickers with special marking, according to the Government Gazette 1257b / 2003 by ANDRIANOS.

External placement of bottles in a closet, special marking according to the regulation

Internal network in the restaurant kitchen

The installation was undertaken by EOT - EXE (Special Group of Energy Saving Technicians), the specialized group of engineers and licensed gas technicians ensuring the long life of the system, its smooth operation and especially the safety of staff and customers.








