Modern Electromechanical Equipment at the Hospital of Kalamata

The ANDRIANOS undertook, after participating to an open international tender, and successfully completed the replacement of the old  chimneys with new modern ones, as well as the modernization of the boiler room and the cooling plant by changing the old pumps with new modern high energy efficiency ones and all other components, and finally the maintenance of the collectors and the pipes.

This project included two subprojects: The first one of these concerned the upgrade of manifolds by replacing pumps, valves, check valves and the rest of control instruments, plus the insulation at main manifolds for heating, cooling, stream, circutalion of hot water for use. There were selected new, modern materials and accessories by the brands IVR, GEMAK and EBRO, certified according to European standards and the new circulators are by the leading brands WILO and GRUNDFOS with high energy efficiency, in line with the new European directive ERP 2013.

The second sub-project was about dismantling the old chimneys and installing new modern ones. The five new chimneys that were installed on the two steam generators and on the three hot water boilers in the boiler room of the General Hospital of Messinia, are ΙΝΟΧ 316L model, HI LINE GAS CE. The new chimneys have 450mm diameter and are made by stainless steel, with double insulation, 316 on the internal side nai 304 on the outer. Their insulation is for rock wood 128kg/m3 and 2.5 cm thickness, with out thermal brigdes. They could be used for oil or gas boilers and are cerftified with CE. 

 

This project is expected to increase the efficiency of the hospital’s boilers as a result of better extraction fume, while the new route outside of the building, will significantly decreased the risk of CO leaks, which will raise the level of security for staff and visitors of the hospital. Also the possibility for damage and energy loss in the overall functioning of the E / M equipment, was significantly decreased after the new equipment installments, especially with the new circulators that will contribute significantly to the energy and resources saving of the hospital.

 

The ANDRIANOS company with 21 years of experience in heating and cooling systems, has successfully completed this project, thanks to its premium technical options and specialized personel. It thus contributes indirectly to the development and improvement of services provided to the citizens of Kalamata and Messinia.The ANDRIANOS company with 21 years of experience in heating and cooling systems, has successfully completed this project, thanks to its premium technical options and specialized personel. It thus contributes indirectly to the development and improvement of services provided to the citizens of Kalamata and Messinia.

anoxeidotes-kaminades

 

The new stainless steel chimneys at the hospital of Kalamata


 kollekter-atmou-prin-meta

 

Steam manifold at the Hospital of Kalamata before and after the operations

 

kollekter-thermansis-prin-meta

 

The central heating manifold at the Hospital before and after the operations

 

psuxrostastio

 

The cooling manifold at the hospital with new the modern pumps

 

Newsletter

I like to be informed about the latest energy solutions and the best deals!

Share it!

Credit and debit cards accepted

Basic Info

ANDRIANOS - World Leading Energy Saving Technologies

Address:
Platonos 30, Kalamata 241 00

Phone:
+30 2721 023124
+30 2721 088151

Fax: 2721 096522

Email:

Working hours

Monday         8AM–5PM
Tuesday         8AM–5PM
Wednesday   8AM–5PM
Thursday       8AM–5PM
Friday             8AM–5PM
Saturday        Closed
Sunday           Closed

(Time Zone: GMT+3)

ANDRIANOS ENERGY SAVING

Find us on map